The 2035 projected no build traffic (what will happen if no ESH is built) is based on the 2035 Land Use Plan, population and employment projections, the 2035 adopted Long Range Transportation Plan, historical growth rates, and existing and predicted mode shares. It assumes that those projects already programmed in the region’s Transportation Improvement Program (TIP) and planned beyond the TIP schedule, will be in place by 2035.
Posted in: Traffic